top of page
Design process

Design Process- We Provide Clients  With Different Design Ideas In Accordance With The Existing Bathroom Dimensions.

demolition

Demolition Is The First Step. We Make Sure That Everything Is Removed Without Causing Any Hassles To The Residents. 

removal of tiles

​

Removal Of Wall And Floor Tiles.

Removal Of Old Sanitary and Plumbing Pipes And Installation of New Ones.

removal and installation

Selection Of Tiles, Sanitary Ware And Plumbing Fixtures Before Installation.

Chosen Tiles Are Fixed To The Floor And Walls. Proper Slope Is Maintained to Drain Out The  water.

1.jpg

All The Fittings Are Fixed And Is Ready To Use. 

Clean It Up And Experience Your  New Bathroom Space.

  • Facebook Social Icon
  • Instagram Social Icon

Copyright © 2022 .All Rights Reserved. batheligant.com

bottom of page